The Keystone Railroad models the Pennsylvania Railroad’s Philadelphia to Harrisburg mainline. The time period is 1957-1964. The mainline is complete and the railroad will be ready for operations once the car card system and dispatcher’s panels are complete. The layout will feature heavy electrics, typical of the PRR, diesels and the occasional steam excursion. The layout will be fully signaled using PRR position signals and operated with Digitrax DCC products.

Photos

Click to enlarge

Track Plan

Click to enlarge